The Buildings Looked Fine The Numbers Didn’t

Beautiful buildings. Trusted teams. Hidden costs.

 

Across hospitals, schools, offices, and major institutions, Resolute has identified millions in estimated savings opportunities using data from existing building systems.

​

The issues weren't always obvious. The financial impact was.

$4.78M

Saving Found

860

Issues Found

$2.80M

Saved

650+

Issues Resolved

Purple BackGround_2x.png

14

Organizations

400+

Buildings Connected

57

Health System Buildings

218

K–12 District Buildings

RESULTS ACROSS RESOLUTE BUILDINGS

background commissioning.png
cfo.png

$37K

RESEARCH BUILDING

  • IMPLEMENTED  

Some rooms needed 24/7 service. Others didn't.
 

A research building operated around the clock, but not every space needed continuous heating and cooling.

​

Schedules were adjusted while maintaining service for critical research areas.

Approximately $37K in estimated implemented value over 38 months.

$360K

SURGERY CENTER

  • IMPLEMENTED 

More air was moving than required.

Operating-room ventilation was running above required levels, making equipment work harder than necessary.

​

The system was recommissioned to meet required ventilation levels.

Up to $360K in estimated implemented value over 112 months

$43K

SCHOOL

  • IMPLEMENTED 

The building was running at night. Not during class.

Heating and cooling equipment was operating overnight and shutting down during parts of the school day.

​

The schedules were corrected.

Up to $43K in estimated implemented value over 60 months.

$82K

  • IMPLEMENTED 

The lights were on 24/7.

A manual override kept one building's lights running beyond their intended schedule.

​

Restoring automatic controls addressed the issue.

$82K in estimated implemented value over 67 months.

$156K

Four fans were running near full speed.

  • IDENTIFIED 

The building didn't always need that much airflow.

But four large air handlers continued operating at nearly full speed, even when demand was lower.

Restoring their designed speed controls was identified as a significant opportunity.

Up to $156K in estimated potential savings identified within 48 days.

$218K

CULTURAL FACILITY

  • IDENTIFIED 

Found in 48 days.

Within weeks of connecting to a campus, Resolute identified significant opportunities at one facility.

​

The first finding appeared in just 17 days.

Ten savings findings were documented within the first 29 days.

Up to $218K in estimated opportunities identified within 48 days.

$769K

31 SCHOOLS

  • IDENTIFIED 

Across 31 schools.

Across a large school district, heating and cooling equipment was running when buildings were empty.

 

The same problem appeared repeatedly, creating significant opportunities to reduce unnecessary operating costs.

Up to $769K in estimated savings identified across 31 schools over 60 months.

Big Financial Impact. Ordinary Building Problems.

The Problem Doesn't Have to Look Big to Cost Big.

A building can look beautiful. People can feel comfortable. Everything can appear to be working.

 

But small operating issues can quietly add up to significant costs.

A Schedule.
A Fan.
A Light.
A Setpoint.
A Valve.
A Damper
A Setting.
Just because a problem isn't visible doesn't mean it isn't expensive.

Finding the Opportunity
Is Just the Beginning

Resolute works alongside facility teams to uncover hidden costs, understand their financial impact, and prioritize what matters.

2.png
FIND THE PROBLEM

Identify operating issues using data from existing building systems

3.png
PRIORITIZE THE WORK

Understand the estimated financial impact so teams can focus on what matters most.

4.png
VERIFY THE RESULTS

Help teams address issues and maintain visibility into building performance over time.

Real insight. Clear priorities. Ongoing support.

What Could Your Buildings Be Hiding?

WHAT’S NEXT

Your buildings already produce valuable information.

Resolute turns that data into financial insight, helping you identify opportunities, prioritize improvements, and make more informed decisions.

A brief conversation about your buildings and where hidden costs may exist.

235 Pierce St, Birmingham, MI 48009

  • Facebook
  • LinkedIn
  • YouTube

For Updates, Subscribe

© 2026 by Resolute Building Intelligence LLC.  All Rights Reserved.

bottom of page